Located just outside of Oklahoma City this WWTP chlorine contact basin was lined with approximately 22,000 sq. ft of 45-mil Hypalon. Lange Containment Systems successfully fabricated and installed 6 pre-fabricated panels for the project as well as provided the field installation. The project consisted of 10oz geotextile below the 45-mil Hypalon liner, ASTM grade 316 stainless steel mechanical attachment with rope hem, pipe boots, SS vents, and 2 baffle curtains. Installation took approximately 12 days.
Project Photos:




















